Search Latest topics | Thermal camera installation on NI TCS bench and alignment checks Tue Jun 23, 2009 8:19 pm by Alessio Task performed by Campagna, Canuel, Marque, see Virgo logbook entry #23340 Comments: 0 WI CO2 camera re-installation Tue Jun 23, 2009 8:13 pm by Alessio Task performed by Vajente, Marque and Canuel, see Virgo logbook entry #23339 Comments: 0 TCS power meters replaced witn photodiodes Fri Jun 19, 2009 9:19 am by Alessio In the both bench we (Maurizio and I) have installed the Photodiodes to the replacement of Power Meters. Comments: 1 Thermal cameras installation Fri Jun 19, 2009 9:12 am by Alessio Today we tried to install the thermal cameras for the TCS beam monitoring. The cameras should be installed on the beam reflected by the beamsplitter that recombines the CH with the annular heating. The whol;e setup was simulated with Zemax and according to the simulation the suitable optics have been purchased. We started from the WI. Comments: 0 NI power calibration Tue Apr 21, 2009 7:22 pm by Alessio Since it was noticed that, starting from a certain time, the power read by the power-meter of the NI TCS gives negative values in the region of the minimum transmitted power (see entry TCS NI power calibration), we repeated the calibration. Results are plotted in the figure. Comments: 0 WI CO2 laser noise Thu Mar 12, 2009 5:48 pm by Alessio Since the WI laser is injecting noise in the dark fringe (see Virgo Logbook entry 22321), today we investigated this issue by replacing the power meter with a photodiode. Comments: 0 Data Display: New configuration file TCS_18feb Wed Feb 18, 2009 7:39 pm by mdipaolo In the configuration file TCS_18feb i have modified the values of offset and scaling factor with new values for the following channels: Comments: 0 Thermal Camera: Try to fit Central Heating (North bench) Wed Feb 18, 2009 6:57 pm by mdipaolo With the Help of entry to LogBook ToR Cascina "MatLab Comments: 0 CH Beam Splitter Replacement (2) Thu Feb 12, 2009 6:46 pm by mdipaolo Today we have replacemented the original Beam Splitter (II-VI) that we calibrated to Tor Vergata (see for details the entry "Polarization vs rotation of the beam splitter (2)" in Tor Vergata Section). Comments: 1 | Statistics We have 7 registered usersThe newest registered user is Alessandro Our users have posted a total of 213 messages in 101 subjects Who is Online ? In total there is 1 user online :: 0 Registered, 0 Hidden and 1 Guest None Most users ever online was 5 on Wed Jul 01, 2009 12:45 pm |







» WI CO2 camera re-installation
» TCS power meters replaced witn photodiodes
» Thermal cameras installation
» Radiative cooling system with three rings cold directed
» New PDs
» Measure with New Pre.Aamp
» Strange
» New Outiline 2