CH Beam Splitter Replacement (2)

View previous topic View next topic Go down

CH Beam Splitter Replacement (2)

Post  mdipaolo on Thu Feb 12, 2009 6:46 pm

Today we have replacemented the original Beam Splitter (II-VI) that we calibrated to Tor Vergata (see for details the entry "Polarization vs rotation of the beam splitter (2)" in Tor Vergata Section).

We have put the beam splitter in a particular position in order to have a minimum polarization. After this we have controld the setup and alignment the bench NI and WI.

Moreover we have calibrated the attenuator for the central heating: power trasmitted in operation with the step (variable that is visualized in the software interface). The power range of the central heating (CH) is:

NI: 0 ----- 83 mW
WI: 7 mW ---- 120 mW





After we have also calibrated the power the ring...In the following report the figures.




The minimum power for the ring CO2 in both bench is around 150 mW.

In the following figures we report the picture of the Ring and Central heating after the alignment and the substitution of the beam splitter.
NI:


WI:

mdipaolo

Posts: 106
Join date: 2008-11-05

View user profile

Back to top Go down

LIGO rings

Post  Alessio on Thu Feb 12, 2009 8:19 pm

Just for comparison, I'm posting a couple of images of the rings used at LIGO Hanford...





...and at Livingstone


_________________
================
Alessio Rocchi, Ph.D.
Virgo/Virgo+ TCS Responsible
INFN Roma Tor Vergata
I was asked to change my signature

Alessio

Posts: 124
Join date: 2008-11-07
Age: 38
Location: Rome

View user profile

Back to top Go down

View previous topic View next topic Back to top


Permissions of this forum:
You cannot reply to topics in this forum